Buying guide · About 3 min read · Updated

Nissan Navara YD25 replacement engine: what should you check before buying?

In short: Before you buy a YD25 replacement engine, confirm the model and series (D22, D40 or R51), the emissions version and the cylinder head, find out what killed the old engine, and plan what moves across. Our new YD25 long motor, with the AMC head, Euro 3, is listed at $6,950.

Price as listed on our store on 15 October 2026.

Is your Navara actually a YD25?

Check before anything else. The YD25 is in the D22 Navara from 2008, the D40 Navara (2005 to about 2015) and the R51 Pathfinder (2005 to 2013). Older D22s used the QD32, TD27 or ZD30, and the 2015-on NP300 Navara uses a 2.3 litre engine. We list the QD32 and TD27 too.

Which YD25 version do you need?

Our listing names the YD25 with the AMC cylinder head, Euro 3. The YD25 was built in more than one version: early ones used a rotary injection pump and later ones common rail, with different outputs by model and year. The version in your vehicle decides which injection parts, sensors and wiring come across.

Send us the VIN, the series and a photo of the engine number, and we confirm it. See will this engine fit my vehicle.

What killed the old engine?

On the YD25 the usual suspects are the timing chain and the EGR cooler.

  • Chain jumped: the cause is the chain itself. The new engine starts with a new chain, so keep up the checks from here.
  • Overheated: find out why. A leaking EGR cooler can boil coolant away with no puddle. If that was the cause, the cooler must be fixed before the new engine runs.

Our YD25 engine problems article covers both.

What moves across from the old engine?

On a long motor, the outside parts come across: the turbo, injectors and fuel system, manifolds, EGR parts, sensors, starter and alternator.

What should your quote include?

  1. The engine: code, version, build and price.
  2. Fitting labour, or freight to your mechanic.
  3. Fluids and filters.
  4. The EGR cooler, if it is suspect.
  5. Any worn outside parts found when it comes off.
  6. The warranty terms.

Quotes are valid for 30 days. Fitting jobs take a 50% deposit; engine-only orders are paid in full before dispatch.

How do you look after the new engine?

Running-in oil for the first 1,000 km, then the service schedule. Listen for chain noise and watch the coolant level. See running in a new engine.

Get a YD25 quote

Use the enquiry form with the vehicle's model, year, series, rego and VIN, and whether you need it fitted. Or call 02 9737 0105.

Related

More engine advice

Nissan YD25 engine, side view in its yellow protective bag
Engine problems

YD25 engine problems: timing chains, EGR coolers and when to replace

Read
Toyota 2GR-FE engine, front end of the V6
Buying guide

2GR-FE engine replacement: what should Kluger, Aurion and Tarago owners check first?

Read
Engine bay
Buying guide

Engine tests: what should a mechanic check before recommending a new engine?

Read